You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan JPO Marunda Terus Dikebut

Marunda Pedestrian Bridge Repair to Complete May 2024

The repair of Marunda Pedestrian Bridge, North Jakarta which was hit by a truck on Saturday (4/16), is targeted to complete next month.

was newly launched last year

North Jakarta Bina Marga Sub-agency Head, Ilham Raya, said the repair is under Jakarta Bina Marga's City Utility and Facility Division.

Bina Marga to Build Four JPOs with Modern Feel This Year

"The repair has been running by third parties. Some of the materials are being ordered," he said, Thursday (4/18).

He added that the company owns truck container commits to take responsibility of this matter.

"The pedestrian bridge was newly launched last year. It is hoped the repair can run smoothly," he added.

Meanwhile, Jakarta Bina Marga's City Utility and Facility Development Section Head, Semporanto Pandopotan Marpaung, stated the pedestrian bridge has length 22.6 meters.

"The incident did not give impact to bridge structure," he stated.

Meanwhile, one of Cilincing Urban Village residents, Asmi (33), admitted the bridge assists her much to cross the road safely.

"The bridge is important for children or students to cross the road safely," she stated.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1366 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye829 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye635 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye606 personAldi Geri Lumban Tobing